Vibration-free splitting, partial demolition and removal of a large diameter concrete foundation piles protruding over neighbouring parcel and obstructing the construction of a building. Non-explosive demolition agent Dynacem was used to create planned and controlled linear cracks and to splitt the piles. Delaminated pieces of the concrete piles were removed in a very delicate manner, without generating any vibrations or noise and most importantly without damaging the building supported by the piles.

Return to the gallery index