Breaking, excavation and removal of rock from the basement in order to lower the floor level (to increase floor to ceiling height) using the non-explosive demolition and rock breaking agent Dynacem. Thanks to the application of Dynacem, the total noise, vibrations and emissions were significantly reduced. Possible damages to the building structural components were avoided.

Return to the gallery index